|| Ababel Co. for General Trading and Cons. ||

We would like to introduce our company to you, Ababel contractions was established in 1989 as a private company in Baghdad, and been involved in many private and public projects and grew over the years to become one of the main competitors in the construction industry in Iraq with the best work force and experienced engineers.

We have two offices in Baghdad with a total of 89 employees, and invested heavily in our tools and machinery stock of steel forms and timber and shutters make our company the leading construction company for concrete.

We love to participate in rebuilding our country in the best way, looking forward hear from you and to consider our company in implementing your projects.

If you need more information please do not hesitate to contact us. Thank you for your kind attention.

Best regard,

   

                                                                                                      Eng. Mohammad A. Eelewi

                                                                                                          Director Manager

Profile :

 

Commercial Name                       Ababel Construction Comp.

 

Manager Director                        Mohammed Abbas Elewey.

                                                             Civil Eng.

Deputy Director                           Ali Husain M.

                                                             Mechanical Eng.

Commercial Director                    Mohanned F. Rasheed

 

Date of establishing                     22/1/2000

 

Commercial registration No.         8238

 

Grading (Ministry of planning)       1st / Constructions

 

Issuing authority Ministry of commerce

 

Activities Civil, electrical contracts

 

 

Consulting & Engineering staff :

 

 Department of Architecture

 Jihad Timeemie                           Arch.   1989

 

  Department of Civil Eng.

H.A.H. Njris                               Civil Eng.  2002

M.Hamza M.                              Civil Eng.  2001

Mouhamed Abid H.                     Civil Eng.  1986

Dr. Hasanien Al-Zubaidy              Civil Eng.  1992

Mouhamad Abbas E.                   Civil Eng.  1986

Emad Najie H.                            Civil Eng.  1985

Fata Latief J.                              Civil Eng.  1992

Jasim Mouhamad                       Civil Eng.  1985

Safa’a Hanna                             Civil Eng.  2000

Kazum Mtair J                            Civil Eng.  1983

Dawood S. Ezzat                        Civil Eng.  1979

 

   Department of Electrical Eng.

Khalid Al-Rawie                         Elec. Eng.  1992

Haider A.H.                               Elec. Eng.  2001

 

   Department of Mechanical Eng.

Ali Husain M.                             Mech. Eng.  1981

Jawdat Mustafa Gh.                   Mech. Eng.  1979

 

Department of Chemical Eng.

 Mahdie Al-Hakeem                   Chem. Eng.  1982

 

Card of Company :

 

Number of Employees 350

 

Staff Composition :

 

10

Administrative

 

1

Architects

 

1

Chemical Engineer

 

11

Civil Engineers

 

15

Construction Inspectors

 

1

Draftsman

 

1

Economists

 

2

Electrical Engineers

 

2

Estimators

 

1

Interior Designer

 

1

Landscape Architects

 

2

Mechanical Engineers

 

1

Sanitary Engineer

 

1

Structural Engineers

 

3

Surveyors

 

1

Transportations Engineer

 

 

Projects :

Installation of precast buildings in khan-bani-saad in south of baghdad with the finishings,1989.

Construct 3 multistory buildings for alrabeea project with the ministry of industry, 1989,1992.

Installation of 10 ready mix concrete plants for alfaw co. and ministry of industry in different

      locations in  iraq during 1993,1994,1996,1998,1999.

Teacher institute in baghdad palestain street, maintenance and rehabilitations, 1997.

Excution of  2 projects including the roads for al-taji main electrical sanitary services 1998,1999.

Alharith project with faw company, rehabilitations for 9 huge buildings more than 15000 square

      meter,1999.

Alsmood project with ministry of industry, implementation of 3 mooving steel structure buildings with

      the backyards and the roads,1999

Alyarook project with ministry of industry, constuctions many building with many purposes more than

     4500 square meter, 1995

Excution of 52500 precast concrete piles in multistory bridge in baghdad,1993,1994.

Construct 36000 cubic meter of pilecups in the multistory bridge in baghdad ,1993,1994.

Alqriaat projectin baghdad,network nor potable water, 2000.

Alyousifiya power project,faw location with ministry of industry and alqudis therminal power and

     alkarama electrical project,70% of the concrete structures and water tanks and the main roads and

     buildings more than 10,000 square meter, during 1999,2000,2002,2003.

Baquba and rahdiya, high awy works, cuttin and backfilling works , during 2001,2002.

     concrete structure of 3   multistory builings with 7500 square meter for al-rasheed houspital in

     baghdad,2001,2002.

Supplying and installing  14  telecom towers in kirkuk in the north of iraq for asiacell co. 2004.

      gobtappa steel bridge in the north of iraq, steel bridge 180 l.m crossing the river, still under  

      construction.

Rebuilding and prooving and rehabilitaions of akh-jilar vialge in the north of iraq with the seewages pipe

      net ,potable water net work,roads, walkways,football stadume with capacity 3000 person,

      underconstruction.

  Rehabiltaions of ministry of defence in baghdad.

  4 multistory builings , the works was inside and out side finishing, and about 8000 square meter of 

       falsseelings for the entire other buildings.

Documents:

 

 

 

Addresses :

- AMMAN, JORDAN, SHMAISANI, ABU-AL-HASAN AL- ASHAARI STREET, BARHOOMA BULDG, FLAT NO. 1.
BRANCHES OF ABABEL :
- BAGHDA, IRAQ, ZAYOONA.
- SULAIMANYAH, KURDISTAN, IRAQ, ARAM GROUP BUILDING.

- MISR AL JIDEEDA, CAIRO, EGYPT, 11 M.ALASHRI ST.FLAT NO. 4.